Tuesday, April 22, 2008
Studio Finishing Touches - Almost Done
My sink is now in and working. We had several issues of finding the right size drain. Since it's from Germany, the hole is bigger than what it standard in the U.S. After that was done, Randy made a shelf for my mantle mirror. It's solid cast iron and made to sit on a fireplace mantel - it weighs a ton! There is a big bolt at the top to keep it from falling forward. At some point I will stain the shelf but I wanted to get the mirror up off the floor. Only thing left to install are my two door steps. Randy custom made them at his workshop but with the cooler weather it's taking longer for each vanish coat to dry. Hope to have them install in the morning.
Subscribe to:
Post Comments (Atom)
1 comment:
Looks great.
Post a Comment