
The other issue was the table was needed so it wasn't the best place for the boys to play. :(
Another challenge I had after coming home was not having a space big enough to work on the PVC frame. Since I was scheduled to babysit Buzz for a few weeks, I'd planned to work on it. While I was here I found a pile of PVC pipes and fittings in the back 40 they didn't want any more. The other thing is they have a huge backyard with enough space for me to spread everything out. The first frame was way to big so I had to cut everything down. Having the space to spread out was so nice! Now I'm working on making a book shelf and chairs out with the left over pipes scraps.
No comments:
Post a Comment